Welcome to Hitech Semiconductor Co., Limited

SPB-3921

Images are for reference only.
See Product Specifications for product details.

Buy SPB-3921 with confidence from Hitech-Semi.com, 1 Year Warranty

REQUEST A QUOTEDownload PDF
Part NumberSPB-3921
ManufacturerBud Industries
DescriptionBOX STEEL GRAY 2.750"L X 3.250"W
ead Free / RoHS StatusL Lead free / RoHS Compliant
In stock 44893 pcs
Reference Price
(In US Dollars)
Submit a Request For Quotation on quantities greater than those displayed.
Target Price(USD)
Quantity
Type Description
Part Number:SPB-3921
Manufacturer:Bud Industries
Description:BOX STEEL GRAY 2.750"L X 3.250"W
Lead Free Status / RoHS Status:Lead free / RoHS Compliant
Quantity Available:0
Data sheet:SPB-3921 PDF
Category:Boxes, Enclosures, Racks
Filter:Boxes
Area (L x W):8.94in² (57.7cm²)
Color:Gray
Container Type:Box
Design:Cover Included
Features:Mounting Flange, Pushbutton Holes - 1
Height:3.500" (88.90mm)
Material:Metal, Steel
Material Flammability Rating:-
Product Status:Active
Ratings:NEMA 12,13, UL-508
Size / Dimension:3.250" L x 2.750" W (82.55mm x 69.85mm)
Thickness:14 Gauge
Order

Please confirm the specifications of the products when ordering.
MOQ means the minimum order quantity required to purchase each parts.
If you have special order instructions,please note it on the ordering pages.
The Pre-Shipment Inspection (PSI) will be applied.
You can email us to change the order details before shipment.
Orders cannot be canceled after shipping the packages.

Shipping

TT in advance (bank transfer), Credit Card, PayPal can be chosen.
Cash transfer only. (Transfer with checks and bills are not accepted.)
Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
If you need the detailed invoice or tax ID,please email us.

Payment
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
Parts Tags
SPB-3921 Datasheet
SPB-3921 Equivalent
SPB-3921 Supplier
SPB-3921 Data sheet
SPB-3921 PDF Datasheet
SPB-3921 Stock
SPB-3921 Price
SPB-3921 Distributor
SPB-3921 Manufacturer
SPB-3921 Technical Data
SPB-3921 PDF
SPB-3921 Picture
SPB-3921 Image
SPB-3921 Part
SPB-3921 Rfq
SPB-3921 Inquiry
SPB-3921 Online Order
Skype Chat Email Phone
Top